Coffee Development Programme in North Eastern Region: Water Augmentation
The scheme "Coffee Development Programme in North Eastern Region: Water Augmentation" aims to improve the productivity and quality of coffee by facilitating the creation of infrastructure for water augmentation for irrigation and wet processing of coffee.
- Department
- Department Of Commerce
- Who it is for
- Individual
About CDPNER:WA
The scheme "Coffee Development Programme in North Eastern Region: Water Augmentation" is a Sub-Component of the Scheme "Integrated Coffee Development Project During the Medium Term Framework (MTF) Period: Development Support to Stakeholders" by the Coffee Board, Department of Commerce, Ministry of Commerce and Industry. This scheme aims to improve the productivity and quality of coffee by facilitating the creation of infrastructure for water augmentation for irrigation and wet processing of coffee.
Benefits
Subsidy Details
- The eligible subsidy for water harvesting structures and sprinkler units is 75% of the unit cost, capped at a maximum ceiling of ₹1,25,000 for all related activities combined.
- For below-ground water storage tanks, the subsidy is based on the lower value between dimension and unit cost applicable to the size of the holding.
- For above-ground water storage tanks, the subsidy is based on the lower value between the actual cost or the unit cost applicable to the below-ground water tank.
Subsidy Availability
Growers can claim subsidies for water harvesting structures and irrigation equipment either simultaneously or at different times.
Unit Cost and Subsidy for Water Harvesting Structures
Size of HoldingDimension of Water Harvesting StructureTotal Unit Cost (₹)****Subsidy AmountUp to 2 Ha.30' x 30' x 10' (9000 Cft.)₹43,000.0075% of Unit Cost2 Ha to 4 Ha & above43' x 43' x 10' (18490 Cft.)₹89,000.0075% of Unit CostUnit Cost and Subsidy for Sprinkler/Drip Unit
**Size of Holding****Total Unit Cost (₹)****Subsidy Amount**Up to 1.00 Ha. ₹60,000 75% of the Unit Cost1.00 to 2.00 Ha. & above ₹1,20,000 75% of the Unit Cost
Who can apply (eligibility)
- The applicant must be a tribal grower.
- The applicant should not have received a subsidy for Water Augmentation during the XII plan period.
- The land records must be in the beneficiary's name.
- These records should be certified by the Village Authority/State Government/Competent Authority.
Eligible Activities Installation of the water storage tank, open well, and irrigation equipment (sprinkler/drip) to enhance production, productivity, and quality. Location Specifications
- Water storage tank construction can be above or below ground level.
- Water augmentation structures must be on the estate or within its vicinity.
Exclusions
How to apply
Offline application
Procedure for Claiming Subsidy
Step 1: Submission of Required Documents
The beneficiary/applicant submits the necessary documents in the prescribed format after completing the relevant activity.
Step 2: Document Scrutiny and Field Inspection
The Extension Officer examines the submitted documents and conducts a field inspection. They forward the application, physical verification report, and all relevant documents to the concerned Joint Director (Extension) or Deputy Director (Extension), either recommending eligible subsidy release or rejection.
Step 3: Review and Recommendation by Joint Director / Deputy Director
The Joint Director (Extension) or Deputy Director (Extension) thoroughly scrutinizes the documents, ensuring the admissibility of the claim. They determine and approve the applicable subsidy.
Step 4: Release of Subsidy
Upon satisfying the claim's admissibility, the Joint Director (Extension) or Deputy Director (Extension) facilitates the release of the eligible subsidy to the beneficiary through Electronic Fund Transfer (EFT).
Official links and guidelines
Related schemes
National Gopal Ratna Award
All IndiaThe scheme aims to promote scientific dairy practices and AI coverage. It provides awards, recognition, and…
Integrated Scheme for Export Promotion & Quality Improvement in Spices and Research and Development of Cardamom: Reintroduced subcomponents:Supply of Silpaulin Sheets (nos)
All IndiaThe objective of the scheme is to encourage spice growers to adopt hygienic drying practices by using…
Sub-mission on Breed Development of Livestock and Poultry
All IndiaThe Department of Animal Husbandry & Dairying introduced the National Livestock Mission as umbrella scheme.…
Integrated Scheme for Export Promotion & Quality Improvement in Spices and Research and Development of Cardamom: Export Oriented Production:Large Cardamom Replanting/New planting (Ha)
All IndiaUnder this scheme, growers are encouraged to adopt systematic replanting of large cardamom using…
Livestock Health and Diseases Control
All IndiaThe Livestock Health and Diseases Control (LH&DC) scheme is a Centrally Sponsored Scheme (CSS) implemented…
Integrated Scheme for Export Promotion & Quality Improvement in Spices and Research and Development of Cardamom: \Small Cardamom Replanting/New Planting: Karnataka (Ha.) and other States
All IndiaTo motivate growers in Karnataka and other states to improve production and productivity through systematic…